Find help with asbestos inspections and registers for Melbourne properties.

Asbestos register reviews, five-yearly and triggered

When a Victorian asbestos register must be reviewed, what a proper review checks, how to record it, and the events that should trigger one before five years.

A Victorian asbestos register must be reviewed, and revised if needed, at least every five years even when nothing has changed. It must also be kept current between reviews, and it must be reviewed before any demolition or refurbishment. A proper review means going back on site and re-inspecting every item the register lists.

Illustrative photo for Asbestos register reviews, five-yearly and triggered

Reviews requested through this site are quoted and carried out by independent consultants, as the about page sets out.

When must the register be reviewed?

The Occupational Health and Safety Regulations 2017 and WorkSafe’s compliance code set these triggers:

Trigger What the person in control must do
Five years since the last review Review and, if necessary, revise, even if nothing has changed
Change in the condition of asbestos Revise the register to include it
Removal, enclosure or sealing Record what was done
Planned demolition or refurbishment Review before work starts, revise if inadequate for the works, give a copy to whoever does the work
Request from a health and safety representative on reasonable grounds Review the employer’s register and revise if necessary

WorkSafe gives examples of reasonable grounds for that last trigger: a material found to contain asbestos that is not in the register, a change in the condition of a listed item, or a register that is out of date or incomplete.

What does a review involve?

WorkSafe’s guidance says the person reviewing must have the knowledge, skills and experience to do it, and that the task should include finding each listed item, checking its condition and whether it now poses a risk. Previous registers and removal records, including clearance certificates, should be read as part of it.

A thorough review also:

  • re-checks labels and confirms they still match the register locations
  • samples items that were only presumed to contain asbestos, where that would settle the question
  • enters areas recorded as inaccessible last time if they can now be reached
  • adds materials introduced by refits since the last register, and confirms they are asbestos-free or records them
  • notes anything likely to be disturbed by planned maintenance or works

The national survey guide calls this a review or re-inspection survey and adds that buildings such as hospitals and schools may need more frequent reviews.

How to record the review

WorkSafe suggests a documented record of when the review happened, what it involved, the outcome (such as changes in condition) and who did it. Keep the old register and old clearance certificates rather than overwriting them; together they show what has been removed over the building’s life.

Can someone in-house do it?

The compliance code says an in-house person with appropriate instruction and training may be able to walk through the workplace, identify changes to asbestos and update the register. That can suit an interim check after a storm or a minor fit-out. For the formal five-yearly review, or a building with friable material or many tenancies, an external consultant gives a result that is independent of the people managing the building and can be backed by fresh lab results where needed.

Signs a review is overdue

  • The register has no review date, or the last date is more than five years ago.
  • A tenant has refitted since the register was written.
  • Contractors have reported damaged sheeting or ceiling tiles.
  • A sale, new lease or change of managing agent is coming up and the incoming party will ask for the register.
  • You have an older register from before a change in ownership and do not know whether it was ever updated.

What the consultant will need

The current register and any earlier versions, clearance certificates and removal records since, a list of works done since the last review, floor plans, and access to every area listed, including roof spaces and plant rooms. If a demolition or refit is planned, give them the drawings, because the review has to test whether the register is adequate for those works.

Cost

A review can cost less than a first register because the materials are already mapped, but extra samples or newly accessible areas add to it. Published Victorian estimates for an audit or register are $300 to $800; the inspection cost guide shows how the size of the building and sample numbers change that.

What a careful consultant will not skip

  • Physically locating each item rather than re-dating the old entries.
  • Recording items as removed only where there is paperwork, such as a clearance certificate.
  • Flagging a register that is inadequate for planned works, even if the five-year review would otherwise pass.

Local angle

Every handover of management or control, whether a sale, a new managing agent or a head lease ending, means passing the register on. A shop or factory in Footscray or Moorabbin that has changed hands more than once can end up with a register that nobody has checked since it was first written. Starting points for a first register and for a full inspection with sampling are on their own pages.

What to do next

Find the existing register and its last review date, then ask for a register review quote. The legal requirements are in the Occupational Health and Safety Regulations 2017, Part 4.4.

Send a job enquiry

Frequently asked questions

What if our register is older than five years?

Arrange a review now. The five-year review is a legal requirement for the person in control of the workplace. Until it is done, contractors are relying on information that may no longer match the building.

When is the next review due after this one?

No more than five years after this review. Put the review date somewhere obvious, such as the register's cover page. A planned refit, removal work or damage to a listed item can bring the next review forward.

Do tenants need the revised register?

Yes. Every employer or self-employed person whose business is located at the workplace is entitled to a copy, so send the revised version to each tenant business and replace any copy kept on site for contractors.

Can the building stay open during a review?

Usually. A review re-inspects items already listed and may take a few extra samples with hand tools, so occupants can normally carry on. Book access to locked tenancies, roof spaces and plant rooms beforehand so those areas are not recorded as inaccessible again.

Who reviews the employer's register in a leased building?

The tenant employer. The person in control of the building reviews the building register, and each employer that keeps its own employer's register must review it at least every five years and when its health and safety representative asks on reasonable grounds.